Title of article
Pilot scale experiment with MBR operated in intermittent aeration condition: Analysis of biological performance
Author/Authors
Marco Capodici، نويسنده , , M. and Di Bella، نويسنده , , G. and Di Trapani، نويسنده , , D. and Torregrossa، نويسنده , , M.، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2015
Pages
8
From page
398
To page
405
Abstract
The effect of intermittent aeration (IA) on a MBR system was investigated. The study was aimed at analyzing different working conditions and the influence of different IA cycles on the biological performance of the MBR pilot plant, in terms of organic carbon and ammonium removal as well as extracellular polymeric substances (EPSs) production. The membrane modules were placed in a separate compartment, continuously aerated. This configuration allowed to disconnect from the filtration stage the biological phenomena occurring into the IA bioreactor. The observed results highlighted good efficiencies, in terms of organic carbon and ammonium removal. It was noticed a significant soluble microbial products (SMPs) release, likely related to the higher metabolic stress that anoxic conditions exerted on the biomass. However, the proposed configuration, with the membranes in a separate compartment, allowed to reduce the EPSs in the membrane tank even during the non-aerated phase, thus lowering fouling development.
Keywords
intermittent aeration , Biological treatment , Activated sludge , MBR systems
Journal title
Bioresource Technology
Serial Year
2015
Journal title
Bioresource Technology
Record number
1938956