Title of article
Minimum water network design for fixed schedule and cyclic operation batch processes with minimum storage capacity and inter-connections
Author/Authors
Lee، نويسنده , , Sooi Joo and Wan Alwi، نويسنده , , Sharifah R. and Lim، نويسنده , , Jeng Shiun and Manan، نويسنده , , Zainuddin Abdul، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2014
Pages
14
From page
65
To page
78
Abstract
Mathematical programming techniques have been widely used to solve water minimisation problems. Yet, to date, there is lack of research on water minimisation for fixed schedule and cyclic operation batch processes that also targets the minimum storage capacity as well as inter-connections, and considers mass-transfer based (MTB) and non-mass transfer-based (NMTB) operations, for problems with multiple contaminants. In this study, a four-stage mathematical model is formulated to address the aforementioned problem, by considering water minimisation options within a Water Management Hierarchy (WMH). The developed model was employed on an urban and an industrial facility to demonstrate the effectiveness of proposed model to solve the minimum water network with minimum storage tank capacity and network inter-connections. For the urban facility case study involving a mosque, the maximum potential freshwater and wastewater reductions are 99.89% and 65.7%. Setting the minimum number of inter-connections (MNI) as the objective function has further reduced the MNI by 13%. For the industrial case study, the maximum potential freshwater and wastewater reductions are 59.53% and 16.43%. Imposing the MNI constraint as the objective function further reduced the number of inter-connections by 20.83%.
Keywords
Cleaner Production , Minimum storage tank capacity , Minimum water network , Minimum network inter-connections , Water management hierarchy , Optimisation
Journal title
Journal of Cleaner Production
Serial Year
2014
Journal title
Journal of Cleaner Production
Record number
1962314
Link To Document