Title of article :
Bridge over the Besos river, Barcelona, Spain
Author/Authors :
Dubey، .SJ نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 1999
Pages :
-186
From page :
187
To page :
0
Abstract :
The article reports on the construction of concrete chutes and baffles as a measure to control erosion of slopes of high formation on the new railway bridge across the Chambal river. The bridge is a through girder bridge 850.35 m long between Agra and Gwalior stations on the central railway line from Mumbai to New Delhi. The measures adopted for the drainage system as described in thepaper below have shown good results during the recent monsoon.
Keywords :
Zinc , Electrowinning , Current efficiency
Journal title :
INDIAN CONCERTE JOURNAL
Serial Year :
1999
Journal title :
INDIAN CONCERTE JOURNAL
Record number :
19861
Link To Document :
بازگشت