Title of article :
Commissioning of the KEK B-factory
Author/Authors :
Iijima، نويسنده , , Toru، نويسنده ,
Abstract :
The commissioning of the KEK B-factory started on December 1, 1998. In this paper, results obtained by August 1999 are briefly reported. The topics include the accelerator commissioning, the energy scan and the studies of the detector background.
Keywords :
CP violation , Electron–positron collider , B.factory
Journal title :
Astroparticle Physics