Author/Authors :
Tandecki، نويسنده , , M. and Beck، نويسنده , , D. and Beck، نويسنده , , M. and Brand، نويسنده , , H. and Breitenfeldt، نويسنده , , M. and De Leebeeck، نويسنده , , V. and Friedag، نويسنده , , P. and Herlert، نويسنده , , A. and Kozlov، نويسنده , , V. and Mader، نويسنده , , J. and Roccia، نويسنده , , S. and Soti، نويسنده , , G. and Traykov، نويسنده , , E. and Van Gorp، نويسنده , , S. and Wauters، نويسنده , , F. and Weinheimer، نويسنده , , Ch. and، نويسنده ,
Abstract :
The WITCH experiment is a medium-scale experimental set-up located at ISOLDE/CERN. It combines a double Penning trap system with a retardation spectrometer for energy measurements of recoil ions from β decay. For a correct operation of such a set-up a whole range of different devices is required. Along with the installation and optimization of the set-up a computer control system was developed to control these devices. The CS-Framework that is developed and maintained at GSI, was chosen as a basis for this control system as it is perfectly suited to handle the distributed nature of a control system.We report here on the required hardware for WITCH, along with the basis of this CS-Framework and the add-ons that were implemented for WITCH.
Keywords :
LABVIEW , CONTROL SYSTEM , Distributed programming , Penning traps