Author/Authors :
Fahrer، نويسنده , , M. and Dirkes، نويسنده , , Frank G. H. Hartmann، نويسنده , , F. and Heier، نويسنده , , S. and Macpherson، نويسنده , , A. and Müller، نويسنده , , Th. and Weiler، نويسنده , , Th.، نويسنده ,
Abstract :
Based on simulated LHC beam loss scenarios, fully depleted CMS silicon tracker modules and sensors were exposed to 42 ns-long beam spills of approximately 1011 protons per spill at the PS at CERN. The ionisation dose was sufficient to short circuit the silicon sensors. The dynamic behaviour of bias voltage, leakage currents and voltages over coupling capacitors were monitored during the impact. Results of pre- and post-qualification as well as the dynamic behaviour are shown.
Keywords :
Beam loss , Beam abort , Silicon sensor , Silicon strip sensor , Tracker , CMS , LHC , Silicon strip module