Author/Authors :
Sakai، نويسنده , , Kenji and Ooi، نويسنده , , Motoki and Kai، نويسنده , , Tetsuya and Kinoshita، نويسنده , , Hidetaka and Kawasaki، نويسنده , , Susumu and Watanabe، نويسنده , , Akihiko and Kaminaga، نويسنده , , Masanori and Futakawa، نويسنده , , Masatoshi، نويسنده ,
Abstract :
A general control system for the Material and Life Science Experimental Facility (MLF-GCS) at J-PARC is necessary in controlling all the MLF subsystems that include the target, moderator, target station, etc. And while it is an independent system, it needs to work closely with the accelerator and other facility control systems within J-PARC. This paper reports on the status with construction and adjustment of the MLF-GCS with the focus on its operations and interlocks.
Keywords :
General control system , interlock , MLF , J-PARC , neutron source