• Title of article

    A meta-heuristic approach to solve a JIT scheduling problem in hybrid flow shop

  • Author/Authors

    Khalouli، نويسنده , , Safa and Ghedjati، نويسنده , , Fatima and Hamzaoui، نويسنده , , Abdelaziz، نويسنده ,

  • Pages
    7
  • From page
    765
  • To page
    771
  • Abstract
    In this paper we address a hybrid flow shop scheduling problem considering the minimization of the sum of the total earliness and tardiness penalties. This problem is proven to be NP-hard, and consequently the development of heuristic and meta-heuristic approaches to solve it is well justified. So, we propose an ant colony optimization method to deal with this problem. Our proposed method has several features, including some heuristics that specifically take into account both earliness and tardiness penalties to compute the heuristic information values. The performance of our algorithm is tested by numerical experiments on a large number of randomly generated problems. A comparison with solutions performance obtained by some constructive heuristics is presented. The results show that the proposed approach performs well for this problem.
  • Keywords
    Ant Colony Optimization , meta-heuristic , Hybrid flow shop , Scheduling , Tardiness , earliness
  • Journal title
    Astroparticle Physics
  • Record number

    2046786