Title of article
A meta-heuristic approach to solve a JIT scheduling problem in hybrid flow shop
Author/Authors
Khalouli، نويسنده , , Safa and Ghedjati، نويسنده , , Fatima and Hamzaoui، نويسنده , , Abdelaziz، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2010
Pages
7
From page
765
To page
771
Abstract
In this paper we address a hybrid flow shop scheduling problem considering the minimization of the sum of the total earliness and tardiness penalties. This problem is proven to be NP-hard, and consequently the development of heuristic and meta-heuristic approaches to solve it is well justified. So, we propose an ant colony optimization method to deal with this problem. Our proposed method has several features, including some heuristics that specifically take into account both earliness and tardiness penalties to compute the heuristic information values. The performance of our algorithm is tested by numerical experiments on a large number of randomly generated problems. A comparison with solutions performance obtained by some constructive heuristics is presented. The results show that the proposed approach performs well for this problem.
Keywords
Tardiness , earliness , meta-heuristic , Scheduling , Hybrid flow shop , Ant Colony Optimization
Journal title
Engineering Applications of Artificial Intelligence
Serial Year
2010
Journal title
Engineering Applications of Artificial Intelligence
Record number
2125302
Link To Document