• Title of article

    The CMS Preshower construction and commissioning

  • Author/Authors

    Lu، نويسنده , , Rong-Shyang، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2010
  • Pages
    2
  • From page
    103
  • To page
    104
  • Abstract
    The main physics goal of the CMS Preshower detector is to provide good γ – π 0 separation in the endcap regions. The Preshower detector, comprising nearly 4300 silicon strip sensors, was assembled and commissioned in 2008 before being installed in CMS in Spring 2009. The detector check-out shows 99.9% of channels operational with good noise performance.
  • Keywords
    Preshower , CMS , Silicon strip detectors
  • Journal title
    Nuclear Instruments and Methods in Physics Research Section A
  • Serial Year
    2010
  • Journal title
    Nuclear Instruments and Methods in Physics Research Section A
  • Record number

    2170541