Title of article
The CMS Preshower construction and commissioning
Author/Authors
Lu، نويسنده , , Rong-Shyang، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2010
Pages
2
From page
103
To page
104
Abstract
The main physics goal of the CMS Preshower detector is to provide good γ – π 0 separation in the endcap regions. The Preshower detector, comprising nearly 4300 silicon strip sensors, was assembled and commissioned in 2008 before being installed in CMS in Spring 2009. The detector check-out shows 99.9% of channels operational with good noise performance.
Keywords
Preshower , CMS , Silicon strip detectors
Journal title
Nuclear Instruments and Methods in Physics Research Section A
Serial Year
2010
Journal title
Nuclear Instruments and Methods in Physics Research Section A
Record number
2170541
Link To Document