• Title of article

    Construction of the CLEO III drift chamber

  • Author/Authors

    Csorna، نويسنده , , S. and Dickson، نويسنده , , M. P. Dombrowski، نويسنده , , S.von and Glenn، نويسنده , , S. V. Kravchenko، نويسنده , , I. and Marka، نويسنده , , Sz. and Peterson، نويسنده , , D. and Thies، نويسنده , , P. and Thorndike، نويسنده , , E.H.، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 1998
  • Pages
    4
  • From page
    306
  • To page
    309
  • Abstract
    The CLEO III group is constructing a new drift chamber to be installed as part of the staged luminosity upgrade program at the Cornell Electron Storage Ring and compatible with the interaction region optics. Although having less radial extent than the current CLEO II tracking system, CLEO III will have equivalent momentum resolution because of material reduction in the drift chamber inner skin and gas. The thin inner skin requires special attention to the endplate motion due to wire creep. During stringing, use of a robot will fully automate the wire handling on the upper end.
  • Keywords
    CLEO III drift chamber , Stringing procedure
  • Journal title
    Nuclear Instruments and Methods in Physics Research Section A
  • Serial Year
    1998
  • Journal title
    Nuclear Instruments and Methods in Physics Research Section A
  • Record number

    2180153