Title of article :
The PEP-II B-factory: status and prospects
Author/Authors :
Kozanecki، نويسنده , , W، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2000
Pages :
6
From page :
59
To page :
64
Abstract :
The PEP-II asymmetric electron–positron collider, which was completed in July 1998, has started delivering luminosity to the BaBar experiment at SLAC. This paper summarizes the design issues of this novel accelerator complex, the PEP-II performance as achieved during the commissioning runs, and the early running experience with BaBar.
Keywords :
PEP-II , BaBar experiment , High-energy particles
Journal title :
Nuclear Instruments and Methods in Physics Research Section A
Serial Year :
2000
Journal title :
Nuclear Instruments and Methods in Physics Research Section A
Record number :
2186267
Link To Document :
بازگشت