• Title of article

    Performance of the Pohang Light Source

  • Author/Authors

    Lee، نويسنده , , T.-Y. and Choi، نويسنده , , J. and Chung، نويسنده , , Y. and Huang، نويسنده , , J.Y. and Lee، نويسنده , , J.M. and Nam، نويسنده , , S.H. and Youn، نويسنده , , H.S.، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2001
  • Pages
    4
  • From page
    47
  • To page
    50
  • Abstract
    The Pohang Light Source has actively supported users since the commissioning in 1994. In 1999, we had two decisive breakthroughs for the machine performance; installation of feedback systems to actively damp the coupled-bunch instabilities, and 2.5 GeV operation through energy ramping of the 2.0 GeV electron beam from the linac. Now we can provide two stable operation modes, 2.0 and 2.5 GeV modes. This paper describes the upgraded machine performance and the beamline status of the Pohang light source. Having started with two beamlines in 1995, the facility now has 12 beamlines operational, 1 beamline under commissioning, and 7 beamlines under construction.
  • Keywords
    Beam instability , Energy ramping , Beamline , Undulator , Synchrotron light source
  • Journal title
    Nuclear Instruments and Methods in Physics Research Section A
  • Serial Year
    2001
  • Journal title
    Nuclear Instruments and Methods in Physics Research Section A
  • Record number

    2191549