• Title of article

    Solving group scheduling problem in no-wait flexible flowshop with random machine breakdown

  • Author/Authors

    Adressi، A. نويسنده Department of Industrial Engineering, K. N. Toosi University of Technology, Iran, Tehran , , Tasouji Hassanpour ، S. نويسنده Department of Industrial Engineering, K. N. Toosi University of Technology, Iran, Tehran , , Azizi ، V. نويسنده Department of Industrial Engineering, K. N. Toosi University of Technology, Iran, Tehran ,

  • Issue Information
    فصلنامه با شماره پیاپی 15 سال 2016
  • Pages
    12
  • From page
    157
  • To page
    168
  • Abstract
    In this paper, group scheduling problem in no-wait flexible flowshop is considered by considering two stages with group sequence-dependent setup times and random breakdown of the machines. Genetic algorithm and simulated annealing based heuristics have been proposed to solve the problem. The primary objective of scheduling is to minimize the maximum completion time of the jobs for two classes of small and large scale problems. Computational results show that both GA and SA algorithms perform properly, but SA appeared to provide better results for both small and large scale problems.
  • Journal title
    Decision Science Letters
  • Serial Year
    2016
  • Journal title
    Decision Science Letters
  • Record number

    2260172