• Title of article

    Disassembly Scheduling with Capacity Constraints

  • Author/Authors

    Lee، نويسنده , , D.-H. and Xirouchakis، نويسنده , , P. and Zust، نويسنده , , R.، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2002
  • Pages
    4
  • From page
    387
  • To page
    390
  • Abstract
    Disassembly scheduling is the problem of determining the ordering and disassembly schedule for used products while satisfying the demands of their individual parts or components over the planning horizon. The objective is to minimize the sum of purchase, inventory holding, and disassembly operation costs, subject to capacity restrictions in each period. In this paper, an integer programming model, which is a reversed form of the multi-level capacitated lot sizing problem, is suggested to represent and solve the problem optimally. A case study on used inkjet printers is worked out and the test results are reported.
  • Keywords
    optimization , environment , Disassembly scheduling
  • Journal title
    CIRP Annals - Manufacturing Technology
  • Serial Year
    2002
  • Journal title
    CIRP Annals - Manufacturing Technology
  • Record number

    2266405