Title of article :
The impact of run-up in ensuring Rapid Changeover
Author/Authors :
Mileham، نويسنده , , A.R. and Culley، نويسنده , , S.J. and Owen، نويسنده , , G.W. and Newnes، نويسنده , , L.B. and Giess، نويسنده , , M.D. and Bramley، نويسنده , , A.N.، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2004
Pages :
4
From page :
407
To page :
410
Abstract :
Rapid changeover is a key pre-requisite for responsive manufacture. A changeover is typically composed of three phases, run-down, set-up and run-up. Other research has focused almost exclusively on set-up with little being done to address the run-up phase, although it has been shown that doing a set-up fast can often result in a disproportionate increase in run-up. This paper investigates run-up within processing lines for which a rich database of changeover information was collected from several companies. Data mining techniques were then used to identify the factors that had a direct influence on the extent of run-up for a particular line.
Keywords :
Flexibility , Manufacture , Rapid changeover
Journal title :
CIRP Annals - Manufacturing Technology
Serial Year :
2004
Journal title :
CIRP Annals - Manufacturing Technology
Record number :
2266973
Link To Document :
بازگشت