• Title of article

    Rate of crud formation in a copper pilot plant settler

  • Author/Authors

    Aminian، نويسنده , , H. and Bazin، نويسنده , , C.، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 1999
  • Pages
    6
  • From page
    985
  • To page
    990
  • Abstract
    The rate of the crud formation was determined experimentally for a pilot plant solvent extraction settler. The results show that the rate of accumulation of crud decreases slightly with time and that the thickness of the crud in the settler increases with time. The empirical correlation between the thickness of the crud (hc) in centimeter and time (t) in hour can be expressed as hc(t) = 21.39(1-e−0.004t) It was determined that the average rate of increase of the crud thickness for the studied pilot settler is approximately 0.04 cm/h over a period of 14 days.
  • Keywords
    Solvent extraction , Leaching , hydrometallurgy
  • Journal title
    Minerals Engineering
  • Serial Year
    1999
  • Journal title
    Minerals Engineering
  • Record number

    2273446