Title of article
Operation of the Las Cruces ferric sulphate leach pilot plant
Author/Authors
Smalley، نويسنده , , N. and Dams، نويسنده , , G.، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2000
Pages
10
From page
599
To page
608
Abstract
As part of the Feasibility Study for the Las Cruces copper deposit, Rio Tinto Technology carried out an in-depth evaluation of two hydrometallurgical processes. The two options examined were mild pressure leaching and atmospheric ferric sulphate leaching. Both were proved technically viable at pilot plant scale. The atmospheric ferric leach pilot plant was designed, constructed and operated by Rio Tinto Research & Technology Development (R&TD), Melbourne in order to evaluate areas of technical uncertainty, to generate process design data and establish the department of elements in the various process streams. This paper provides a review of the pilot plant operation and presents some of the results generated from this work.
Keywords
Leaching , biotechnology , hydrometallurgy , Extractive metallurgy
Journal title
Minerals Engineering
Serial Year
2000
Journal title
Minerals Engineering
Record number
2273559
Link To Document