Title of article
Copper–gold ore processing with ion exchange and SART technology
Author/Authors
Hedjazi، نويسنده , , Farhang and Monhemius، نويسنده , , A. John، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2014
Pages
6
From page
120
To page
125
Abstract
Anglo Asian Mining has developed a 50,000 oz Au/yr open pit gold mine at Gedabek in Western Azerbaijan. The deposit at Gedabek is a copper–gold porphyry, comprising both oxide and sulphide ore mineralisation, which is being mined at the rate of about 1 million tons of ore per year. Ore processing is by conventional cyanide heap leaching, which produces a pregnant leach solution (PLS) containing 1–2 ppm of gold, together with 1000 ppm or more of copper. The PLS is treated by column ion exchange, using Dow’s gold-selective MINIX resin. Loaded resin is stripped with an acidic thiourea solution, from which gold and silver are electrowon on to stainless steel mesh cathodes. Copper concentrations in the leach solutions are controlled by passing part of the PLS flow through a SART process, where the acronym stands for “Sulphidisation, Acidification, Recycling and Thickening”. The product from the SART process is a copper/silver sulphide precipitate, which is thickened, filtered and dried and then sold for copper smelting.
Keywords
Gold ore processing , Copper–gold porphyries , Gold ion exchange , SART technology
Journal title
Minerals Engineering
Serial Year
2014
Journal title
Minerals Engineering
Record number
2277596
Link To Document