Title of article :
The social cost of dredging: The Bahia Blanca Estuary case
Author/Authors :
Zilio، نويسنده , , Mariana I. and London، نويسنده , , Silvia and Perillo، نويسنده , , Gerardo M.E. and Cintia Piccolo، نويسنده , , M.، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2013
Abstract :
The Bahia Blanca Estuary System constitutes an ecosystem unique in the world by its physical, geographic and biological characteristics. In the frame of a major investment project related with natural gas provision, a dredging process has been planned and its execution results imminent. However, the analysis of socioeconomic effects of this dredging process has not been performed up to now. In this context, our objective is to estimate social costs and benefits of the dredging process related with the gas plant project mainly derived from the loss of the nursery services of the estuary and the loss of the jobs associated with fishing activities. Our results indicate that socioeconomic cost of the dredging related with the project is between US$ 5 million and US$ 6.5 million depending on how the displaced labor force can be reallocated.
Journal title :
Ocean and Coastal Management
Journal title :
Ocean and Coastal Management