Title of article :
A New Technology of Rapid Sealing Roadway in Luotuoshan Coal Mine
Author/Authors :
Wang، نويسنده , , Wei and Hu، نويسنده , , Baoyu، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2011
Pages :
6
From page :
429
To page :
434
Abstract :
After the large water accident with the serious collapse occurred in Luotuoshan coal mine, to achieve rescuing emergency rapidly, the scheme with blocking up water was adopted. The concerned technical measures include forming blocking up water wall‘s skeleton through injecting two-fluid slurry into tunnel, filling these gaps in skeleton with high flow under static pressure condition, reinforcing alluvium on the tunnel floor with high pressure, and filling tiny cracks in block up water wall with draining. The tunnel was blocked up successfully in only 54 days and the effect reaches 99.97%. The successful application of these technical measures provided valuable experiences that can draw lessons for engineering works under similar conditions in the future.
Keywords :
Water gushing-out , Blocking-up water wall , ALLUVIUM , Grouting Technology with dewatering , Static pressure condition
Journal title :
Procedia Earth and Planetary Science
Serial Year :
2011
Journal title :
Procedia Earth and Planetary Science
Record number :
2319981
Link To Document :
بازگشت