• Title of article

    Loss of a 30″ directional crossing due to pipeline collapse during pullback

  • Author/Authors

    Booman، نويسنده , , Janine and Kunert، نويسنده , , Hernan and Otegui، نويسنده , , José Luis، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2013
  • Pages
    10
  • From page
    388
  • To page
    397
  • Abstract
    This article concerns the loss of a Horizontal Directional Drilling crossing due to a failure that took place during pullback of the pipeline. The more than 500 m long drilling was meant to lodge a 30″ pipeline that crossed a large river. The failure caused the total loss of the crossing, and the necessity to repeat the entire process in another, less favorable location. Root causes involved a difficult soil composition, and constraints at a populated bank that led to engineering solutions not proved before on a pipe of such diameter. Discontinuities on the tunnel and the use of a sacrifice pipe at the front end of the pipe column, which was related to the need for more pipes than originally calculated because of a series of problems at the beginning of the perforation, were also defined as root causes. Lessons learned are highlighted.
  • Keywords
    Pipe collapse , HDD crossing , Tunnel loss , Failure during pullback
  • Journal title
    Engineering Failure Analysis
  • Serial Year
    2013
  • Journal title
    Engineering Failure Analysis
  • Record number