Title of article
Numerical analysis of the causes of face slab cracks in Gongboxia rockfill dam
Author/Authors
Wang، نويسنده , , Zijian and Liu، نويسنده , , Sihong and Vallejo، نويسنده , , José Luis and Wang، نويسنده , , Liujiang، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2014
Pages
9
From page
224
To page
232
Abstract
There are face slab cracks on the Gongboxia concrete face rockfill dam (CFRD), which is located on the Yellow River in China. They generally occur as vertical cracks at the top of the panel near the water level. The region where Gongboxia CFRD is located is subjected to low temperatures during the winter months and high temperatures during the summer months. Also, this region experiences large temperature fluctuations during the day and night. In this study, the causes of crack formation in the face slabs of the dam are numerically analyzed from the perspective of structural- and temperature-induced stresses. The results show that temperature-induced stress is the main reason for the slab cracks on the Gongboxia CFRD; the structure-induced stresses lead to more cracks in the steep dam section than in the riverbed dam section, and the occurrence of vertical cracks are likely caused by slight variations in the water level.
Keywords
concrete slab crack , temperature-induced stress , structure-induced stress , FEM , concrete face rockfill dam (CFRD)
Journal title
Engineering Geology
Serial Year
2014
Journal title
Engineering Geology
Record number
2342780
Link To Document