Title of article :
A case history of Tunnel Boring Machine jamming in an inter-layer shear zone at the Yellow River Diversion Project in China
Author/Authors :
Shang، نويسنده , , Yanjun and Xue، نويسنده , , Jihong and Wang، نويسنده , , Sijing and Yang، نويسنده , , Zhifa and Yang، نويسنده , , Jie، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2004
Abstract :
This is a case study of a Tunnel Boring Machine (TBM) jamming in a section of the Connection Works No. 7 tunnel of the Yellow River Diversion Project (YRDP) in China. Analysis of tunnel lithology, rock convergence by shearing, rock strength and ground stress, indicates that a high rate of convergence within an inter-layer shear zone in the lower part of an anticline was a dominant factor in the jamming. In addition, the shield encountered unfavorable tunnelling conditions in the form of wet clay, groundwater inflow, and cavities, coincident with tensile stresses in the lower part of an adjacent syncline. Based on these diagnoses, economical and quick measures were adopted, including additional excavation outside of the shield leaving free space to release the TBM. After 9 days of being jammed, the TBM was totally released and resumed normal excavation. This example highlights lessons learned from folding and inter-layer shear zone in TBM tunnelling.
Keywords :
Inter-layer shear zone , TBM , Marl , fold
Journal title :
Engineering Geology