• Title of article

    Principal engineering geological problems in the Shisanling Pumped Storage Power Station, China

  • Author/Authors

    Li، نويسنده , , Guangcheng and Han، نويسنده , , Zhicheng، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2004
  • Pages
    12
  • From page
    165
  • To page
    176
  • Abstract
    The Shisanling Pumped Storage Power Station is the first of this kind in China. The geological conditions thereat are complex. There are four principal engineering geological problems that are related to the project: site selection of the underground powerhouse, leakage in the lower reservoir, collapse in the penstock tunnel, and stability of the west slope of the upper reservoir. In this paper, these problems and relevant counter measures are briefly introduced.
  • Keywords
    Shisanling Pumped Storage Power Station , Principal engineering geological problems , Instability , Leakage , Collapse
  • Journal title
    Engineering Geology
  • Serial Year
    2004
  • Journal title
    Engineering Geology
  • Record number

    2345729