Principal engineering geological problems in the Shisanling Pumped Storage Power Station, China
Author/Authors
Li، نويسنده , , Guangcheng and Han، نويسنده , , Zhicheng، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2004
Pages
12
From page
165
To page
176
Abstract
The Shisanling Pumped Storage Power Station is the first of this kind in China. The geological conditions thereat are complex. There are four principal engineering geological problems that are related to the project: site selection of the underground powerhouse, leakage in the lower reservoir, collapse in the penstock tunnel, and stability of the west slope of the upper reservoir. In this paper, these problems and relevant counter measures are briefly introduced.
Keywords
Shisanling Pumped Storage Power Station , Principal engineering geological problems , Instability , Leakage , Collapse
Journal title
Engineering Geology
Serial Year
2004
Journal title
Engineering Geology
Record number
2345729
Link To Document