Title of article :
EK-Fenton process for removal of phenanthrene in a two-dimensional soil system
Author/Authors :
Park، نويسنده , , Ji-Yeon and Kim، نويسنده , , Sang Joon and Lee، نويسنده , , You-Jin and Baek، نويسنده , , Kitae and Yang، نويسنده , , Ji-Won، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2005
Pages :
8
From page :
217
To page :
224
Abstract :
Feasibility of electrokinetic (EK) process combined with Fenton-like reaction was investigated for the removal of phenanthrene in a two-dimensional cell. Sandy soil and bentonite were selected as a model soil and a filling material to inhibit the leak of electrolyte solution within the electrode reservoirs into the soil by hydraulic pressure difference, respectively. The effects of parameters including current, electroosmotic flow (EOF), electrolyte pH, and moisture content on the removal efficiency were examined under constant voltage. end of operation for 21 days, the concentration of phenanthrene near the anode was lower than the other positions of soil specimen and increased gradually towards the cathode because hydrogen peroxide solution was supplied from anode to cathode region following the direction of EOF. The concentration of phenanthrene at the bottom soil was lower than that at the top soil. Because capillary attraction in the sandy soil with high porosity was too low to maintain appropriate moisture at the top of the cell, EOF moved through the bottom soil with higher moisture content. Overall removal efficiency at 140 V was 81.6%, which was higher than 68.9% at 100 V because total EOF increased by a factor of 1.5 upon increase of the voltage from 100 to 140 V. In addition, power consumptions at 100 and 140 V were 7.2 and 19.4 kWh, respectively.
Keywords :
Phenanthrene , Electrokinetic remediation , Fenton reaction , Hydrogen peroxide
Journal title :
Engineering Geology
Serial Year :
2005
Journal title :
Engineering Geology
Record number :
2345782
Link To Document :
بازگشت