Title of article :
Prediction of tunnel lining loads using correction factors
Author/Authors :
Kim، نويسنده , , H.J. and Eisenstein، نويسنده , , Z.، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2006
Pages :
11
From page :
302
To page :
312
Abstract :
A design method for the prediction of lining loads should include the decrease of lining loads due to the stress release before lining installation and the increase of lining loads due to development of ground yielding. Schwartz and Einstein included both factors in their original closed form solutions in the form of a support delay factor λd and a yield factor λy respectively. The validity of the design method is reviewed by comparing the loads calculated using the methods with the field measurements obtained from several tunnels. The possible causes of the load discrepancy between measurements and predictions are presented. tz and Einsteinʹs proposed method gives reasonable results for tunnels with short delay lengths. However, the method could not be used reliably for tunnels either with long delay lengths or with voids between the soil and TBM due to the difficulties finding the pre-support ground movements and therefore λd.
Keywords :
Tunnel lining loads , Support delay factor , Yield factor , Prediction of lining loads , Field measurements
Journal title :
Engineering Geology
Serial Year :
2006
Journal title :
Engineering Geology
Record number :
2346116
Link To Document :
بازگشت