Title of article
Hierarchy probability cost analysis model incorporate MAIMS principle for EPC project cost estimation
Author/Authors
Gu، نويسنده , , Xiangbai and Geng، نويسنده , , Zhiqiang and Xu، نويسنده , , Wenxing and Zhu، نويسنده , , Qunxiong، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2011
Pages
12
From page
8087
To page
8098
Abstract
Two new types of hierarchy probability cost analysis (HPCA) model incorporating money allocated is money spent (MAIMS) principle based on definite work breakdown structure (WBS) level for EPC (engineering, procurement and construction) projects are presented. The proposed models have skillfully solved dilemma to appropriate cost elements and maximize the efficiency of information for cost risk analysis. Macroscopic and microscopic risk analysis of the project cost elements are introduced for meaningful model input. The illustration of an actual bidding EPC project substantiates that proposed integrating HPCA-hierarchy MAIMS models have demonstrated effective and viable for EPC projects.
Keywords
Maximize efficiency of information , Uncertainty Management , Cost management strategy , Hierarchy probability cost analysis (HPCA) model
Journal title
Expert Systems with Applications
Serial Year
2011
Journal title
Expert Systems with Applications
Record number
2349529
Link To Document