This paper describes the status of Japanese efforts for hosting ITER in Japan. In May 2002, Japanese Government decided to propose an ITER site, Rokkasho in Aomori Prefecture, a Northern part of the main island, based on the comprehensive/intensive assessments by the Site Selection Committee established by Japanese Government. ITER is designed basically with a potential flexibility beyond the detailed technical objectives to have more clear scope for developing technical key elements in a future power plant. Various flexibilities in the construction, operation and decommissioning of ITER are totally assessed. Consequently the Japanese site has been chosen and it satisfies sufficiently not only the Site Requirements and the Site Design Assumptions but also the further extension and flexibilities. In particular the potential for more flexible construction schedule and operations is technically described as well as the fulfillment of the site requirements and its assumptions as the minimum requirements in this paper. The socio-cultural environment is also described briefly because of a key aspect for the scientists and engineers who will participate in the project.
Keywords :
ITER , Japanese site , Rokkasho
Journal title :
Fusion Engineering and Design
Serial Year :
2003
Journal title :
Fusion Engineering and Design
Record number :
2351620
Link To Document :
بازگشت