    Studies for site preparation for ITER construction

  • Author/Authors

    Fardeau، نويسنده , , Agnès and Blanc، نويسنده , , Frédéric and Cardettini، نويسنده , , Jean-Daniel and Mandine، نويسنده , , Jean-Robert and Guérin، نويسنده , , Roland and Patisson، نويسنده , , Laurent and Bergégère، نويسنده , , Pierre and Santagiustina، نويسنده , , Andrea and Garin، نويسنده , , Pascal، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2005
  • Pages
    7
  • From page
    121
  • To page
    127
  • Abstract
    The implantation of a nuclear facility, such as ITER (about 20 buildings on 40 ha) requires many preparatory studies, particularly with respect to underground characteristics, topography, layout, deforestation, excavations, networks, fences and roads and impact of seismic hazard on design. aper presents the main results of these studies, carried out within the European ITER Site Studies Framework. A dedicated paper [O. Guérin, B. Coururier, A. Maas, Transport, logistics and packaging of ITER components, 23rd SOFT, 2004, Venice, Italy] in the conference deals with the transport studies. ose the site for ITER implantation, detailed geological, hydrogeological and geophysical investigations have been carried out. Taking into account the meteorological data (particularly the main wind direction), topography, access, electrical supply, fluid needs and constraints (gravity systems), buildings and roads have been implemented.
  • Keywords
    site preparation , ITER , geology , LAYOUT , topography , electrical network , Fluids network , Seismic conditions , Cadarache
  • Journal title
    Fusion Engineering and Design
  • Serial Year
    2005
  • Journal title
    Fusion Engineering and Design
  • Record number

    2352005