• Title of article

    An overview of the EAST project

  • Author/Authors

    Wu، نويسنده , , Songtao، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2007
  • Pages
    9
  • From page
    463
  • To page
    471
  • Abstract
    The China national project of experimental advanced superconducting tokamak (EAST) has finished its construction phase and in the physical operation phase now in the Institute of Plasma Physics, the Chinese Academy of Sciences (ASIPP). The EAST is a full superconducting tokamak with a non-circle cross-section of the vacuum vessel and the active cooling plasma facing components. The project consists of a superconducting system tokamak machine, a large scale cryogenic and refrigerator system, power supply system, plasma current drive and heating system and other six subsystems. The first engineering commissioning of the EAST superconducting tokamak has been performed successfully in February 2006. The commissioning results set up the confidence to start physical operation successfully in August 2006.
  • Keywords
    East , Commissioning , Superconducting tokamak
  • Journal title
    Fusion Engineering and Design
  • Serial Year
    2007
  • Journal title
    Fusion Engineering and Design
  • Record number

    2353547