Installation and commisionning of the EU test facility for ITER gyrotrons
Author/Authors
Fasel، نويسنده , , John D. and Alberti، نويسنده , , S. and Bonicelli، نويسنده , , T. and Droz، نويسنده , , E. and Goodman، نويسنده , , T. and Henderson، نويسنده , , M-.A. and Hogge، نويسنده , , J.P. and Lobet، نويسنده , , X.L. and Marletaz، نويسنده , , B. and Marmillod، نويسنده , , Ph. and Perez، نويسنده , , A. and Porte، نويسنده , , L. and Siravo، نويسنده , , U. and Tran، نويسنده , , M.Q.، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2007
Pages
6
From page
881
To page
886
Abstract
In the frame of the EU program on the ITER electron cyclotron wave (ECW) system, the development of a 170 GHz, 2 MW CW coaxial gyrotron with depressed collector (C-GT170) has been launched during the Sixth Framework Program (2003–2006) in the European Technology Workplan. Such development relies on the availability of a test facility (TF) capable of providing both the energy sources and sinks required by this new electron tube (electrical energy, cooling capacity), and allowing the control and acquisition of a large range of signals used to understand and improve the gyrotron behaviour. The TF will be used, in a later stage, for the component test of the ITER ECW system. This paper will report on the design, installation and commissioning of the TF in Lausanne.
Keywords
Radio frequency conditioning unit (RFCU) , Gyrotron , Test facility (TF) , HV power supplies (HVPS) , Superconducting magnet (SCM)
Journal title
Fusion Engineering and Design
Serial Year
2007
Journal title
Fusion Engineering and Design
Record number
2353735
Link To Document