Installation and commisionning of the EU test facility for ITER gyrotrons
Author/Authors :
Fasel، نويسنده , , John D. and Alberti، نويسنده , , S. and Bonicelli، نويسنده , , T. and Droz، نويسنده , , E. and Goodman، نويسنده , , T. and Henderson، نويسنده , , M-.A. and Hogge، نويسنده , , J.P. and Lobet، نويسنده , , X.L. and Marletaz، نويسنده , , B. and Marmillod، نويسنده , , Ph. and Perez، نويسنده , , A. and Porte، نويسنده , , L. and Siravo، نويسنده , , U. and Tran، نويسنده , , M.Q.، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2007
Pages :
6
From page :
881
To page :
886
Abstract :
In the frame of the EU program on the ITER electron cyclotron wave (ECW) system, the development of a 170 GHz, 2 MW CW coaxial gyrotron with depressed collector (C-GT170) has been launched during the Sixth Framework Program (2003–2006) in the European Technology Workplan. Such development relies on the availability of a test facility (TF) capable of providing both the energy sources and sinks required by this new electron tube (electrical energy, cooling capacity), and allowing the control and acquisition of a large range of signals used to understand and improve the gyrotron behaviour. The TF will be used, in a later stage, for the component test of the ITER ECW system. This paper will report on the design, installation and commissioning of the TF in Lausanne.
Keywords :
Radio frequency conditioning unit (RFCU) , Gyrotron , Test facility (TF) , HV power supplies (HVPS) , Superconducting magnet (SCM)