Title of article
Industrial engineering studies for the manufacture of the ITER PF coils
Author/Authors
Libeyre، نويسنده , , P. and Decool، نويسنده , , P. and Guerin، نويسنده , , O. and Perrella، نويسنده , , M. and Bourquard، نويسنده , , A.، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2007
Pages
6
From page
1561
To page
1566
Abstract
Industrial studies have been carried out in Europe to prepare the manufacture of the five poloidal field (PF) coils, which will be manufactured on the ITER site.
t study, carried out by Ansaldo Superconduttori, addressed the manufacturing sequence, assuming the manufacture of the PF coils inside the two buildings which will further host the cryogenic system. A second study, carried out by Alstom investigated how to achieve the manufacture of some crucial points. A new layout of the manufacturing line was proposed, aiming at manufacture of the PF2–6 coils within 36 months. A recent study performed by Alstom, assumes the manufacture of the PF coils in a single dedicated building, releasing so the constraint of meeting the deadline fixed in ITER reference scheme by the starting point of installation of the cryogenic components.
Keywords
ITER , Field , Coils , Manufacture , Poloidal
Journal title
Fusion Engineering and Design
Serial Year
2007
Journal title
Fusion Engineering and Design
Record number
2354015
Link To Document