Title of article :
Configuration Management for Wendelstein 7-X
Author/Authors :
Brakel، نويسنده , , R. and Eeten، نويسنده , , P.v. and Hartmann، نويسنده , , D.A. and Henkelmann، نويسنده , , K. and Knauer، نويسنده , , J. and Müller، نويسنده , , K. and Okkenga-Wolf، نويسنده , , A. and Wenzel، نويسنده , , U.، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2009
Pages :
4
From page :
505
To page :
508
Abstract :
A complex system like the large superconducting Wendelstein 7-X stellarator necessitates a dedicated organizational structure which assures permanent consistency between the requirements of its system specification and the performance attributes of all its components throughout its life time. This includes well-defined processes and centrally coordinated information structures. For this purposes the department Configuration Management (CM) has recently been established at W7-X. The detailed tasks of CM for W7-X are oriented along common CM standards and comprise configuration identification, change management, configuration status accounting and configuration verification. While the assembly of W7-X is proceeding some components are still under procurement or even under design. Thus design changes and non-conformances may have a direct impact on the assembly process. Highest priority has therefore been assigned to efficient control of change and non-conformance processes which might delay the assembly schedule.
Keywords :
configuration management
Journal title :
Fusion Engineering and Design
Serial Year :
2009
Journal title :
Fusion Engineering and Design
Record number :
2355673
Link To Document :
بازگشت