Title of article
Validation of Divertor Cassette locking system with a hydraulic jack tool
Author/Authors
Takalo، نويسنده , , Ville and Esque، نويسنده , , Salvador and Mattila، نويسنده , , Jouni and Vilenius، نويسنده , , Matti and Jنrvenpنن، نويسنده , , Jorma and Siuko، نويسنده , , Mikko and Semeraro، نويسنده , , Luigi and Irving، نويسنده , , Mike and Damiani، نويسنده , , Carlo، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2009
Pages
5
From page
1808
To page
1812
Abstract
The divertor area of ITER vacuum vessel consists of 54 modular cassettes which must be exchanged after every 3–4 years of plasma operations. Divertor Cassettes are locked in the vacuum vessel by means of compressing them against the rails mounted in the inner and outer walls of the vacuum vessel. According to ITER reference cassette locking system, a Divertor Cassette has to be preloaded with a compression force of 360 kN against the vacuum vessel rails. The preloading of the cassettes is carried out with a hydraulic jack tool which is fitted into the cassette body. The Jack will transmit a hydraulic force by pushing the cassette latches against the outer rails, transmitting therefore the required preloading compression force to the cassette. This paper deals with the validation of Divertor Cassette locking system and it also describes the design and testing of a radiation-hard, water hydraulic jack. The validation of Divertor Cassette locking system has been the first Divertor Maintenance operation tested at Divertor Test Platform 2.
Keywords
Divertor cassette , remote handling , Water hydraulic jack
Journal title
Fusion Engineering and Design
Serial Year
2009
Journal title
Fusion Engineering and Design
Record number
2356106
Link To Document