Title of article :
ITER vacuum vessel design and construction
Author/Authors :
Ioki، نويسنده , , K. and Barabash، نويسنده , , V. and Bachmann، نويسنده , , C. and Chappuis، نويسنده , , P. and Choi، نويسنده , , C.H. and Cordier، نويسنده , , J.-J. and Giraud، نويسنده , , B. and Gribov، نويسنده , , Y. and Heitzenroeder، نويسنده , , Ph. and Johnson، نويسنده , , G. and Jones، نويسنده , , L. and Jun، نويسنده , , C. and Kim، نويسنده , , B.C. and Kuzmin، نويسنده , , E. and Loesser، نويسنده , , D. and Martin، نويسنده , , A. and Martinez، نويسنده , , J.-M. and Merola، نويسنده , , M. and Pathak، نويسنده , , H. and Readman، نويسنده , , P. and Sugihara، نويسنده , , M. and Terasawa، نويسنده , , A. and Utin، نويسنده , , Yu. and Wang، نويسنده , , X. and Wu، نويسنده , , S.، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2010
Pages :
7
From page :
1307
To page :
1313
Abstract :
According to recent design review results, the original reference vacuum vessel (VV) design was selected with a number of modifications including 3D shaping of the outboard inner shell. The VV load conditions were updated based on reviews of the plasma disruption and vertical displacement event (VDE) database. The lower port gussets have been reinforced based on structural analysis results, including non-linear buckling. Design of in-vessel coils for the mitigation of edge localized modes (ELM) and plasma vertical stabilization (VS) has progressed. Design of the in-wall-shielding (IWS) has progressed in details. The detailed layout of ferritic steel plates and borated steel plates is optimized based on the toroidal field ripple analysis. The procurement arrangements (PAs) for the VV including ports and IWS have been prepared or signed. Final design reviews were carried out to check readiness for the PA signature. The procedure for licensing the ITER VV according to the French Order on Nuclear Pressure Equipment (ESPN) has started and conformity assessment is being performed by an Agreed Notified Body (ANB). A VV design description document, VV load specification document, hazard and stress analysis reports and particular material appraisal were submitted according to the guideline and RCC-MR requirements.
Keywords :
Vacuum vessel , ITER , Design , construction
Journal title :
Fusion Engineering and Design
Serial Year :
2010
Journal title :
Fusion Engineering and Design
Record number :
2356739
Link To Document :
بازگشت