Title of article :
In-stream wetlands and their significance for channel filling and the catchment sediment budget, Jugiong Creek, New South Wales
Author/Authors :
Zierholz، نويسنده , , C. and Prosser، نويسنده , , I.P. and Fogarty، نويسنده , , P.J. and Rustomji، نويسنده , , P.، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2001
Abstract :
Evidence is presented here of recent and extensive infilling of the incised channel network of the Jugiong Creek catchment, SE Australia. The present channel network resulted from widespread stream and gully incision in the period between 1880 and 1920. Our survey shows that gully floors have been colonised extensively by emergent macrophyte vegetation since before 1944, forming continuous, dense, in-stream wetlands, which now cover 25% of the channel network in the 2175 km2 catchment and have so far trapped almost 2,000,000 t of nutrient-enriched, fine sediments. This mass of sediments represents the equivalent of 4.7 years of annual sediment production across the catchment and in some tributaries, more than 20 years of annual yield is stored within in-stream wetlands.
us work on the late Quaternary stratigraphy of the region has shown that there were repeated phases of channel incision in the past following which the channels quickly stabilised by natural means and then filled with fine-grained sediment to the point of channel extinction, creating unchannelled swampy valley floors. The current formation and spread of in-stream wetlands is interpreted to be the onset of the next infill phase but it is not known whether present conditions will allow complete channel filling and reformation of the pre-existing swampy valley floors. Nevertheless, further spread of in-stream wetlands is likely to increase the sediment trapping capacity and further reduce the discharge of sediments and nutrients into the Murrumbidgee River. The in-stream wetlands may provide a significant capacity to buffer erosion from gullied catchments of considerable size (up to 300 km2) as an adjunct to current riparian management options. They may also assist the recovery of sediment-impacted channels downstream.
Keywords :
sediment budget , Channel networks , In-stream wetlands , Channel filling
Journal title :
Geomorphology
Journal title :
Geomorphology