• Title of article

    Dose rates evaluation of HiPER facility

  • Author/Authors

    Juلrez، نويسنده , , Rafael Martinez-Sanz، نويسنده , , Javier and Perlado، نويسنده , , José M. and Le Garrec، نويسنده , , Bruno، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2011
  • Pages
    5
  • From page
    694
  • To page
    698
  • Abstract
    During the operation of the HiPER first engineering facility, up to 1.2 × 105 MJ/yr of fusion neutrons yields are foreseen. This irradiation level could be distributed in 100 MJ detonations, accounting up to 100 detonations in a single burst, with 10 Hz repetition rate. A burst would take place every month. The dose rates are computed and different concrete shields are evaluated within the target bay. During the operation of the facility the entrance is forbidden inside the bioshield. Between bursts, manual maintenance might be performed inside the bioshield but outside the final optics assembly (FOA) shield. Inside the FOA shield the residual dose rates are so high that only remote maintenance is allowed. The FOA shield reduces the delivered dose rate to optics in a factor of 30.3.
  • Keywords
    Prompt dose , HiPER project , Radiation shielding , Residual dose , Neutron activation
  • Journal title
    Fusion Engineering and Design
  • Serial Year
    2011
  • Journal title
    Fusion Engineering and Design
  • Record number