Title of article
Test of ITER conductors in SULTAN: An update
Author/Authors
Bruzzone، نويسنده , , Pierluigi and Stepanov، نويسنده , , Boris and Wesche، نويسنده , , Rainer and Herzog، نويسنده , , Robert and Calzolaio، نويسنده , , Ciro and Vogel، نويسنده , , Martin، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2011
Pages
4
From page
1406
To page
1409
Abstract
The ITER Toroidal Field (TF) conductor qualification phase has been carried out by testing short sample prototype conductors in the SULTAN test facility. This phase, started in 2007, has been substantially completed after minor adjustment of the conductor specification and test procedures. All the parties involved in the TF conductor procurement passed the qualification phase. Starting 2010, the samples for TF process qualification phase are tested in SULTAN. A summary of the results for all the ITER Qualification samples and an updated statistics are presented for the V–I and V–T characteristics of the cable-in-conduit conductors (CICC), including Nb3Sn and NbTi samples assembled with either a “bottom joint” or a “U-bend”.
chnical improvements of the test facility are reported, including the enhanced cyclic loading rate and the calibration of the current meter. An outlook of the ITER conductor tests in the coming years is also presented.
Keywords
Superconducting Cables , Test facilities , testing , Data processing , Cryogenics
Journal title
Fusion Engineering and Design
Serial Year
2011
Journal title
Fusion Engineering and Design
Record number
2358242
Link To Document