• Title of article

    ITER thermal shields at the starting phase of procurement

  • Author/Authors

    Utin، نويسنده , , Yu. and Ioki، نويسنده , , K. and Preble، نويسنده , , J. and Her، نويسنده , , N. and Yu، نويسنده , , J. and Terasawa، نويسنده , , A. and Le Barbier، نويسنده , , R. and Hamlyn-Harris، نويسنده , , C. and Dombrowski، نويسنده , , I. and Chung، نويسنده , , Michael W. and Nam، نويسنده , , K. C. Noh، نويسنده , , C. and Kang، نويسنده , , D.K. and Gapionok، نويسنده , , E.، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2011
  • Pages
    4
  • From page
    2051
  • To page
    2054
  • Abstract
    Recent progress of the ITER thermal shields (TS) design is presented. As the ITER construction phase approaches, the design of the TS has been improved and developed in more detail with the focus on better performance, improved manufacture ability and successful assembly at the ITER-site. Aiming at the supply of the TS components to the ITER-site, the Procurement Arrangement with the Korean Domestic Agency (KO DA) was signed. In cooperation with the Korean industry, a preliminary study of the TS manufacture was performed – accompanied with several R&D activities (including manufacture of a full-size mock-up of the TS panel). Results of all above activities are described in this paper.
  • Keywords
    ITER thermal shield , Design , Manufacture study , D activities , Procurement , R&
  • Journal title
    Fusion Engineering and Design
  • Serial Year
    2011
  • Journal title
    Fusion Engineering and Design
  • Record number

    2358781