Title of article :
ITER thermal shields at the starting phase of procurement
Author/Authors :
Utin، نويسنده , , Yu. and Ioki، نويسنده , , K. and Preble، نويسنده , , J. and Her، نويسنده , , N. and Yu، نويسنده , , J. and Terasawa، نويسنده , , A. and Le Barbier، نويسنده , , R. and Hamlyn-Harris، نويسنده , , C. and Dombrowski، نويسنده , , I. and Chung، نويسنده , , Michael W. and Nam، نويسنده , , K. C. Noh، نويسنده , , C. and Kang، نويسنده , , D.K. and Gapionok، نويسنده , , E.، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2011
Pages :
4
From page :
2051
To page :
2054
Abstract :
Recent progress of the ITER thermal shields (TS) design is presented. As the ITER construction phase approaches, the design of the TS has been improved and developed in more detail with the focus on better performance, improved manufacture ability and successful assembly at the ITER-site. Aiming at the supply of the TS components to the ITER-site, the Procurement Arrangement with the Korean Domestic Agency (KO DA) was signed. In cooperation with the Korean industry, a preliminary study of the TS manufacture was performed – accompanied with several R&D activities (including manufacture of a full-size mock-up of the TS panel). Results of all above activities are described in this paper.
Keywords :
ITER thermal shield , Design , Manufacture study , D activities , Procurement , R&
Journal title :
Fusion Engineering and Design
Serial Year :
2011
Journal title :
Fusion Engineering and Design
Record number :
2358781
Link To Document :
بازگشت