• Title of article

    Enhancement of the remote handling strategy for the refurbishment of the backplate bayonet concept of IFMIF target system

  • Author/Authors

    Miccichè، نويسنده , , G. and Lorenzelli، نويسنده , , L. and Bernardi، نويسنده , , D. and Queral، نويسنده , , V.، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2011
  • Pages
    4
  • From page
    2109
  • To page
    2112
  • Abstract
    One of the most technically challenging activities of the IFMIF facility is the maintenance and the refurbishment of its components, and among these the target system appears to be critical since it is located in the most severe region of neutron irradiation (60 dpa/fpy). Two different target assembly systems have been developed: the first is known as integral target while the second one is based on the so called replaceable backplate bayonet concept. The present remote handling (RH) procedures developed for the refurbishment of the removable backplate foresee the removal of all the components from the upper part of the test cell. This operation has a strong impact on the intervention time for the backplate refurbishment which has to be repeated at least every year. Consequently the need to update the RH strategy for the refurbishment of this component becomes a precondition in order to fulfill the stringent requirement to enhance the duty cycle of IFMIF plant. In this paper two potential approaches are presented: the first relies on the possibility to perform all the refurbishment operations in situ in the test cell cavern, whilst the second one foresees to perform these operations off-line in a hot cell. Advantages and disadvantages of these approaches together with the RH requirements for the refurbishment operations of the backplate bayonet concepts are also reported.
  • Keywords
    Target assembly , IFMIF , remote handling
  • Journal title
    Fusion Engineering and Design
  • Serial Year
    2011
  • Journal title
    Fusion Engineering and Design
  • Record number

    2358817