    Kondo، نويسنده , , H. Kawano-Furukawa، نويسنده , , T. and Hirakawa، نويسنده , , Y. and Iuchi، نويسنده , , H. and Kanemura، نويسنده , , T. and Ida، نويسنده , , M. and Watanabe، نويسنده , , K. and Horiike، نويسنده , , H. and Yamaoka، نويسنده , , N. and Matsushita، نويسنده , , I. and Wakai، نويسنده , , E. and Nakamura، نويسنده , , K.، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2012
  • Pages
    5
  • From page
    418
  • To page
    422
  • Abstract
    The EVEDA Li test loop (ELTL) successfully completed its construction and installation of a total of 2.5-ton Li in the frame work of the IFMIF/EVEDA as one of the ITER-BA. Design for the ELTL had been done from March 2009 to December 2009 in large part, and then the construction was started on November 2009 in the O-arai site of the Japan Atomic Energy Agency and completed on the middle of November 2010 after passing an authority inspection by a fire department in O-arai town. Subsequently, the 2.5-ton Li was installed to the ELTL by using a glove box in the form of ingots which is 240 mm long and 125 mm in diameter. The nitrogen concentration in the 2.5-ton Li was found to be 127 wppm. During the installation, the oxygen concentration and the humidity in the glove box were almost kept less than 20 wppm, and any large contamination by air was prevented during the handling of Li.
  • Keywords
    Beam target , IFMIF/EVEDA , Liquid metal , lithium
  • Journal title
    Fusion Engineering and Design
  • Serial Year
    2012
  • Journal title
    Fusion Engineering and Design
  • Record number

    2359328