• Title of article

    Progress on design and R&D for helium-cooled ceramic breeder TBM in China

  • Author/Authors

    Feng، نويسنده , , K.M and Pan، نويسنده , , C.H. and Zhang، نويسنده , , G.S and Luo، نويسنده , , T.Y. and Zhao، نويسنده , , Z. and Chen، نويسنده , , Y.J. and Feng، نويسنده , , Y.J. and Ye، نويسنده , , X.F. and Hu، نويسنده , , G. and He، نويسنده , , K.H. and Niu، نويسنده , , R.W. and Li، نويسنده , , Z.X. and Wang، نويسنده , , P.H. and Xiang، نويسنده , , B. and Zhang، نويسنده , , L. and Wang، نويسنده , , Q.J. and Zhao، نويسنده , , F.C. and Cao، نويسنده , , Q.X. and Wang، نويسنده , , F. and Yuan، نويسنده , , T. and Zheng، نويسنده , , G.Y. and Liu، نويسنده , , Y. and Zhong، نويسنده , , Y. and Zhang، نويسنده , , M.C.، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2012
  • Pages
    8
  • From page
    1138
  • To page
    1145
  • Abstract
    The helium-cooled ceramic breeder (HCCB) test blanket module (TBM) is the primary option of the Chinese TBM program. Current progress on the design and R&D for Chinese helium-cooled ceramic breeder TBM (CN HCCB TBM) in China is presented. The main updated design and related R&D of CN HCCB TBM are introduced briefly. The mock-up fabrication and component tests for Chinese test blanket module are being carried out. Recent status of the components and fabrication technology development is also reported. The neutron multiplier Be pebbles, tritium breeder Li4SiO4 pebbles, and structure material CFL-1 are being prepared in the laboratory scale. The fabrication of 1/3 sized mock-up and construction of a He test loop are being carried out. The key technology development is proceeding to the large scale mock-up fabrication and demonstration tests toward on ITER testing.
  • Keywords
    ITER , Test blanket module , CN HCCB TBM , Helium-cooled solid breeder blanket
  • Journal title
    Fusion Engineering and Design
  • Serial Year
    2012
  • Journal title
    Fusion Engineering and Design
  • Record number

    2360520