Title of article
The new build to print design of the ITER Torus Cryopump
Author/Authors
Dremel، نويسنده , , M. and Pearce، نويسنده , , R. and Strobel، نويسنده , , H. and Hauer، نويسنده , , V. and Day، نويسنده , , C. and Wikus، نويسنده , , P. and Papastergiou، نويسنده , , S.، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2013
Pages
4
From page
760
To page
763
Abstract
The common design of the cryopumps for pumping the divertor and the cryostat has been completed at ITER following more than 10 years of development including prototyping and a number of design studies. This final design, which will be validated by building a Pre-Production Cryopump, achieves a number of simplifications and is expected to solve issues identified in previous concepts.
per will present the build to print manufacturing design of the cryopump according to European Standards. The fabrication and qualification methods will be discussed and a summary of the main manufacturing methods will be given. The design of the valve assembly and its integration in the cryopump with the valve shaft double bellows will be described in detail.
Keywords
ITER , Torus cryopump , Pressure equipment
Journal title
Fusion Engineering and Design
Serial Year
2013
Journal title
Fusion Engineering and Design
Record number
2360918
Link To Document