Title of article
Rail deployment operation test for ITER blanket handling system with positioning misalignment
Author/Authors
Takeda، نويسنده , , Nobukazu and Aburadani، نويسنده , , Atsushi and Tanigawa، نويسنده , , Hisashi and Shigematsu، نويسنده , , Soichiro and Kozaka، نويسنده , , Hiroshi and Murakami، نويسنده , , Shin and Kakudate، نويسنده , , Satoshi and Nakahira، نويسنده , , Masataka and Tesini، نويسنده , , Alessandro، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2013
Pages
4
From page
2186
To page
2189
Abstract
R&D for rail deployment equipment was performed for the ITER blanket remote handling system. The target torque for the automatic operation was investigated. The result shows that the 20% of the rated torque is adequate as the torque limitation for the automatic operation. A schedule for the procurement of the blanket remote handling system, which will be delivered to the ITER in 2020, was also shown.
Keywords
ITER , Blanket , remote handling , manipulator , Rail deployment
Journal title
Fusion Engineering and Design
Serial Year
2013
Journal title
Fusion Engineering and Design
Record number
2361860
Link To Document