Title of article :
First wall fabrication of 1/3 scale china dual functional lithium lead blanket
Author/Authors :
Huang، نويسنده , , Bo and Zhai، نويسنده , , Yutao and Zhang، نويسنده , , Junyu and Li، نويسنده , , Chunjing and Wu، نويسنده , , Qingsheng and Huang، نويسنده , , Qunying، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2014
Pages :
5
From page :
1181
To page :
1185
Abstract :
The dual functional lithium lead blanket is chosen as one of the candidate blankets for China fusion reactor, for its advantages of tritium breeding and good heat exchange performance. As one of the most important components of the blanket, the first wall (FW) is assembled with China low activation martensitic (CLAM) rectangular tubes and plates by hot isostatic pressing (HIP)–diffusion bonding (DB). In this work, the rectangular tube fabrication and FW assembly were carried out in order to verify the feasibility of the FW fabrication scheme. The mechanical property and dimensional accuracy of CLAM rectangular tubes were tested, the microstructure observation and non-destructive detection revealed the sound of the FW mock-up, and the reliability of the FW mock-ups is under evaluation.
Keywords :
Rectangular tube , Test blanket module , Hot Isostatic Pressing , China low activation matensitic steel , First wall
Journal title :
Fusion Engineering and Design
Serial Year :
2014
Journal title :
Fusion Engineering and Design
Record number :
2362392
Link To Document :
بازگشت