Title of article :
Analysis of an in-service rupture of the inner first wall of tore supra
Author/Authors :
Mitteau، نويسنده , , R and Chappuis، نويسنده , , P and Martin، نويسنده , , G and Rosanvallon، نويسنده , , S، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2001
Pages :
5
From page :
445
To page :
449
Abstract :
The last experimental campaign of Tore Supra was also the last one with a set of plasma facing components mainly dating from the assembly of the machine in 1988. This campaign was interrupted a few days ahead of schedule because of the rupture of one coolant tube of the Inner First Wall (IFW). The rupture was observed by an abrupt increase of the pressure in the vessel. It was caused by a water leak which occurred 2 s after the end of the lower hybrid heating pulse during the current ramp-down. Investigations show that the accident is not related to the operation of the machine or a weaker element but rather to a localised heat flux exceeding the heat removal capability of the IFW.
Keywords :
Tore Supra , Inner first wall , Water leak , heat flux
Journal title :
Fusion Engineering and Design
Serial Year :
2001
Journal title :
Fusion Engineering and Design
Record number :
2366786
Link To Document :
بازگشت