• Title of article

    Analysis of an in-service rupture of the inner first wall of tore supra

  • Author/Authors

    Mitteau، نويسنده , , R and Chappuis، نويسنده , , P and Martin، نويسنده , , G and Rosanvallon، نويسنده , , S، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2001
  • Pages
    5
  • From page
    445
  • To page
    449
  • Abstract
    The last experimental campaign of Tore Supra was also the last one with a set of plasma facing components mainly dating from the assembly of the machine in 1988. This campaign was interrupted a few days ahead of schedule because of the rupture of one coolant tube of the Inner First Wall (IFW). The rupture was observed by an abrupt increase of the pressure in the vessel. It was caused by a water leak which occurred 2 s after the end of the lower hybrid heating pulse during the current ramp-down. Investigations show that the accident is not related to the operation of the machine or a weaker element but rather to a localised heat flux exceeding the heat removal capability of the IFW.
  • Keywords
    Tore Supra , Inner first wall , Water leak , heat flux
  • Journal title
    Fusion Engineering and Design
  • Serial Year
    2001
  • Journal title
    Fusion Engineering and Design
  • Record number

    2366786