Author/Authors :
Leuterer، نويسنده , , F. and Kirov، نويسنده , , K. and Monaco، نويسنده , , F. and Münich، نويسنده , , M. and Schütz، نويسنده , , H. and Ryter، نويسنده , , F. and Wagner، نويسنده , , Michael D. and Wilhelm، نويسنده , , R. and Zohm، نويسنده , , H. and Franke، نويسنده , , T. and Voigt، نويسنده , , K. and Thumm، نويسنده , , M. and Heidinger، نويسنده , , R. and Dammertz، نويسنده , , G. and Koppenburg، نويسنده , , K. and Gantenbein، نويسنده , , David G. and Haile، نويسنده ,
Abstract :
A new ECRH system is being constructed for ASDEX Upgrade with a total power of 4 MW, generated by four gyrotrons, and a pulse duration of 10 s. Particular features are the use of gyrotrons which can work at various frequencies in the range 104–140 GHz and correspondingly broad band transmission components. The transmission will be at normal air pressure, and at the torus we will have a tunable double disk vacuum window. A further aim is the installation of fast moveable mirrors for a feedback controlled localized power deposition.