• Title of article

    Development status of KSTAR 5 GHz LHCD system

  • Author/Authors

    Park، نويسنده , , S. and Do، نويسنده , , H. and Jeong، نويسنده , , J.H. and Namkung، نويسنده , , W. and Cho، نويسنده , , M.H. and Park، نويسنده , , H. and Bae، نويسنده , , Y.S. and Yang، نويسنده , , H.L. and Ellis، نويسنده , , R. and Wilson، نويسنده , , J.R. and Hosea، نويسنده , , J.، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2010
  • Pages
    8
  • From page
    197
  • To page
    204
  • Abstract
    A steady-state lower hybrid current drive (LHCD) system is under development for advanced tokamak experiments of the Korea Superconducting Tokamak Advanced Research (KSTAR) device. The KSTAR 5 GHz steady-state LHCD system is being designed to couple an input power of 2 MW for 300 s generated by four 5 GHz klystrons. For the development of this system, there are two critical issues. One is the development of a 5 GHz CW klystron for the RF source of the system. The other is the design of a steady-state LH launcher with active water cooling. In this paper, the current status of the development and design for the KSTAR steady-state LHCD system is described. For the LHCD system, aiming at a basic experimental study of 5 GHz LH wave propagation and operational experience with an LHCD system, the installation of an initial LHCD system with a capacity of 0.5 MW for 2 s is scheduled in 2010 using a 5 GHz prototype klystron and an un-cooled 1 MW launcher. The design and progress for the initial LHCD system are also presented.
  • Keywords
    KSTAR LHCD , LH launcher , KSTAR initial LHCD , Klystron
  • Journal title
    Fusion Engineering and Design
  • Serial Year
    2010
  • Journal title
    Fusion Engineering and Design
  • Record number

    2370067