SULTAN test facility: Summary of recent results
Author/Authors :
Stepanov، نويسنده , , Boris and Bruzzone، نويسنده , , Pierluigi and Sedlak، نويسنده , , Kamil and Croari، نويسنده , , Giancarlo، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2013
Abstract :
The test campaigns of the ITER conductors in the SULTAN test facility re-started in December 2011 after three months break. The main focus of the activities is about the qualification tests of the Central Solenoid (CS) conductors, with three different samples for a total six variations of strand suppliers and cable layouts. In 2012, five Toroidal Field (TF) conductor samples have also been tested as part of the supplier and process qualification phase of the European, Korean, Chinese and Russian Federation Agencies.
ary of the test results for all the ITER samples tested in the last period is presented, including an updated statistics of the broad transition, the performance degradation and the impact of layout variations.
le of SULTAN test facility during the ITER construction is reviewed, and the load of work for the next three years is anticipated.
Keywords :
ITER , Cable-in-conduit conductor , Tests and results , Cyclic loading , SULTAN test facility